Belka
AIPC

Intelligent system for automated control at mining and ore processing plants and non-ferrous metallurgical plants.

We expand the range of opportunities related to the processing of natural resources.

are ensured via the sequential implementation of functional modules of the ISAUTPM.
Rapid results and sustainable development of the production management system
taking into account the constantly fluctuating conditions and complex combinations of several parameters.
BELKA makes complex decisions on behalf of the operator,

Mission

Technical features

Belka is an intelligent system that manages the technological process automatically in real-time
Monitors operating parameters and technical condition of equipment
Temperature, Vibration, Pressure, Network controller
by utilizing virtual analyzers, IIoT sensors, and machine vision, the system acquires supplementary information about the object
Acquires additional knowledge of the object
by using data from the ACS and previous laboratory measurements
Evaluates and predicts the quality of the concentrate
for key process parameters
Advises the operator about optimal settings
When we started working with Belka, we already had a state-of-the-art automated control system from Honeywell. Nevertheless, Belka adaptive machine learning algorithms, when integrated into the ACS, enabled us to even further increase productivity at the SGOc
Sergey Kazantsev
VP of Digital Transformation, NLMK
due to the high variability of the properties of the incoming ore
The instability of the technological process
02
where multiple specialists with varying goals and tasks are involved in the management, relying on personal knowledge and subjective experience
The influence of the human factor
03
thanks to to its interconnectivity and the presence of a significant number of alternative technological schemes
The complexity of the technological process
01
Successful in real production conditions, as it takes into account:
Production conditions

Results of implementation

2
p.p.
up to
Improvement of mineral extraction
Boosting operational efficiency
2
%
by up to
10
%
by
Reducing losses
Reducing payback period
6
up to
mth.
Office in Kazakhstan
Astana city, Almaty district, Baurzhan Momyshuly avenue, building 2B, apartment 1B.
+7 908 066 84 87
Office in Russia
Chelyabinsk city, Lenin street, 89,
office 103
+971 (4) 401 85 66
Office in United Arab Emirates
Office 105, level 1
Emaar Square — Building 4
Sheikh Mohammed Bin Rashid Boulevard
Downtown Dubai, United Arab Emirates
Get in touch
or to discuss any further inquiries that you may have.
We are readily available to discuss your project in more detail
Made in omburo.com
Assisted by visual-point.net